SaskPower is sending a crew(s) out to do a VISUAL line inspection of its transmission line that runs between Wolverine and Condie. This affects land within the RM of Sherwood No. 159.
The crew will be starting their inspection today, March 18th, and will be travelling under the transmission line using a side-by-side. There is no physical work taking place on the power line and power will not be impacted.